The town of Centreville-Wareham-Trinity is seeking quotes to prep & place concrete at the War Memorial Site near the Central Arena.
The quote is for the following:
- The concreted area must be prepped with a well bed of tamped crushed stone before concrete mixture is poured.
- Cement should be 30 MPA with hardener & using standard rebar.
- An area of concrete for the memorial base (120″ X 30″) will be a thickness of 12″ and all other areas will be 6″ thick.
- Council is looking to have 3 crosses stamped into the concrete, color to be determined. A drawing is attached to this quote for reference.
- Concrete to be kept wet during curing process.